18th May 2008. The concrete sections for the entrance to the marina from the canal are now in place. The actual marina basin is still dry and the walkways are quite narrow and a good test for vertigo. The canal can be seen to the left and the edge of Pendle Hill just about creeps into the right hand side of the picture.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment